TSB Long Distance Delivery Power Booster

TSB Long Distance Delivery Power Booster

产品概述:Our long-distance transmission booster booster will solve all construction voltage problems for you! There is no need to replace the cable, the original constru···

产品简介

The principle of boost / booster voltage stabilizer:

According to the analysis of similar users mainly suitable for AC 50 /60HZ, input range: 285V to 475V, output fully automatic booster voltage regulation: 400V/415V±3 ﹪ The voltage of the power supply circuit can be set . (the terminal voltage is very low and the voltage fluctuation range is large which makes the electrical equipment unable to start and operate normally. It is an extremely ideal power supply equipment . The product has fully automatic voltage regulation and boosting , and the voltage regulation speed is fast ( 0.1 0/S Voltage regulation range: 285V 475V, strong overload capacity , high reliability mechanical


Design:

Install 1 booster cabinet according to the position of the user equipment distribution hole; install 1 step down cabinet in the hole, and match 1 set of midway power in the middle of the hole ; if the power supply voltage is unstable, our company 's AKSBW5 type voltage stabilizer is recommended. , a power supply with multi-functional automation features such as boosting, voltage regulation, voltage regulation, and protection. Additional step-up / step- down cabinet for long distance )


Long-distance conveying lift/ buck cabinet in ultra-long tunnel:

With our many years of rich experience, we specially developed a set of tunnel long-distance transmission supercharger, the power supply radius is ≥5000 meters, which can meet the electricity demand of any equipment. Our long-distance booster booster will solve all construction voltage problems for you! There is no need to replace the cable, and the original construction cable is used, which is convenient and quick to install, safer than high-voltage hole entry, cost-saving, affordable, economical and durable.

undefined




model

AKS/TSB-200

AKS/TSB-300

AKS/TSB-400

AKS/TSB-630

AKS/TSB-800

AKS/TSB-1000

AKS/TSB-1200

AKS/TSB-1500

AKS/TSB-2000

capacity

200kVA

300kVA

400kVA

630kVA

800kVA

1000kVA

1200kVA

1500kVA

2000kVA

enter

Rated voltage

400V (AC)

frequency

50Hz/60Hz

Phase

three phase

output

frequency

50Hz/60Hz

Rated output voltage

900~1100V (AC)

Phase

three phase

Technical realization

Engineering realization

The equipment outside the cave is matched with the voltage stabilizer cabinet, and the cave is specially developed and equipped with a set of long-distance transmission booster. The power supply radius is ≥5000 meters for transmission, which can meet the electricity demand of any equipment
. 1. About 1500 meters can be matched with two booster voltage stabilizers. Cabinet (according to the construction line and equipment on site)
2. A matching buck-boost cabinet and voltage stabilizer can be used within 2500 meters (according to the site construction line and equipment)
3. A set of matching can be used within 2500 meters to 3000 meters: Step-down cabinet and voltage-stabilizing cabinet (according to on-site construction lines and equipment)
4. A set of matching sets can be used within 3500 meters to 5,000 meters: stable/up/down-voltage cabinet plus voltage-stabilizing cabinet (according to on-site construction lines and equipment)

Performance characteristics

There is no need to replace the cable, the original construction cable is used, the installation is convenient and fast, it can be reused, and it is safer than the high voltage hole! Cost saving, affordable and durable

parameter

conveying distance

≥5000 meters

No-load current

<4%

Compressive strength

3000V/min without breakdown; test instrument: YZ1802 withstand voltage tester (20mA)

Insulation class

Class F

Insulation resistance

≥2MΩ Test instrument: ZC25B-4 megohmmeter (<1000V)

Connection method

YN

Coil allowable temperature rise

180℃

Cooling method

natural air cooling

noise figure

≤50db(1m)

use

Altitude

≤3000 meters

working environment

Avoid exposure to rain, humidity, heat, extreme heat or direct sunlight. There should be a distance of not less than 40cm between its cooling vents and surrounding objects;
prevent working in places with more corrosive liquids, gases, dust, conductive fibers or metal fines;
prevent working in places with vibration or electromagnetic interference.

Working humidity

Relative humidity<80%

Storage conditions

Avoid long-term upside-down storage and transportation, and can not be subjected to strong impact

Serve

Test program

Under normal power supply conditions, the CPU intelligent operation control is steplessly adjusted, and all parameters are set through the display screen operation or computer setting. When a fault occurs, the machine can issue an alarm, and press the button on the display surface to mute the sound. Liquid crystal LCD Chinese and English menus Display, dynamic scanning fault record, beautiful and clear display

After-sale service

After the machine is installed, the main parts of the machine will be maintained for one year (excluding harsh environments), and the cost of labor and materials will be maintained after one year. The machine has a service life of ten years under normal conditions; it is declared that the regular maintenance and inspection conditions are once every 5 to 10 working days.

Engineering case


One: Unit 95668 of the Chinese People's Liberation Army

Sixteen: Xinjiang Jinvanke Engineering Technology Co., Ltd.


Two: The 96635 Unit of the Chinese People's Liberation Army

Seventeen: China Aviation Industry Supply and Marketing Changsha Co., Ltd.


Three: The 75131 Unit of the Chinese People's Liberation Army

Eighteen: Zhejiang Provincial Tunnel Engineering Company Jinliwen Gas Pipeline Project Tunnel


Four: China Railway First Bureau Ningde Shenhai Expressway

Nineteen: Qingdao Highway Construction Group Co., Ltd. Qinghai Engineering Tunnel


Five: Engineering Project Department of China Railway Fourth Bureau

20: China Railway Bridge Bureau Co., Ltd. Qiaoxiao Expressway


Six: China Railway 11th Bureau Engineering Project Department

Twenty-one: Shanxi Tongjin Mining Co., Ltd.


Seven: China Railway 12th Bureau Engineering Project Department

22: Shandong Yantai Baiheng Gold Mine Co., Ltd.


Eight: Wujiazhai Tunnel of China Railway Seventeenth Bureau

Twenty-three: China Railway Third Bureau Group Second Engineering Co., Ltd.


Nine: China Railway 18th Bureau Shanlian No. 1 Tunnel

Twenty-four: China Water Resources and Hydropower Ninth Engineering Bureau Co., Ltd.


Ten: Engineering Project Department of China Railway 24th Bureau

Twenty-five: Air Force Engineering Construction Bureau of the Eastern Theater of the Chinese People's Liberation Army


Eleven: The Second Detachment of Traffic of the Chinese People's Armed Police Force

Twenty-six: China Railway Eighth Bureau undertakes the construction of the (Laos) Belt and Road project


Twelve: The Fourth Traffic Detachment of the Chinese People's Armed Police Force

Twenty-seven: CCCC Xiamen Engineering Co., Ltd.


Thirteen: CCCC Fourth Highway Engineering Bureau Co., Ltd. and Yu Expressway

28: Zhejiang Tunnel Engineering Group Co., Ltd.


Fourteen: Fujian Strait High Speed Ro-Ro Passenger Shipping Co., Ltd.

Twenty-nine: Wanju International (Hangzhou) Supply Chain Co., Ltd.


Fifteen: Jinliwen Tunnel of China Water Resources and Hydropower Twelfth Engineering Bureau Co., Ltd.

Thirty: China Water Resources and Hydropower Eleventh Engineering Bureau Co., Ltd. Huinu Lingxi Water Diversion Project C3 Project Manager Department



Excel Energy Co., Ltd.

0577-62789660

(联系电话 7×24)