产品概述:Our long-distance transmission booster booster will solve all construction voltage problems for you! There is no need to replace the cable, the original constru···
According to the analysis of similar users ; mainly suitable for AC 50 /60HZ, input range: 285V to 475V, output fully automatic booster voltage regulation: 400V/415V±3 ﹪ The voltage of the power supply circuit can be set . , (the terminal voltage is very low and the voltage fluctuation range is large , which makes the electrical equipment unable to start and operate normally. It is an extremely ideal power supply equipment . The product has fully automatic voltage regulation and boosting , and the voltage regulation speed is fast ( 0.1 0/S ) , Voltage regulation range: 285V ~ 475V, strong overload capacity , high reliability , mechanical
Install 1 booster cabinet according to the position of the user equipment distribution hole; install 1 step - down cabinet in the hole, and match 1 set of midway power in the middle of the hole ; if the power supply voltage is unstable, our company 's AKSBW5 type voltage stabilizer is recommended. , a power supply with multi-functional automation features such as boosting, voltage regulation, voltage regulation, and protection. ( Additional step-up / step- down cabinet for long distance )
With our many years of rich experience, we specially developed a set of tunnel long-distance transmission supercharger, the power supply radius is ≥5000 meters, which can meet the electricity demand of any equipment. Our long-distance booster booster will solve all construction voltage problems for you! There is no need to replace the cable, and the original construction cable is used, which is convenient and quick to install, safer than high-voltage hole entry, cost-saving, affordable, economical and durable.
model | AKS/TSB-200 | AKS/TSB-300 | AKS/TSB-400 | AKS/TSB-630 | AKS/TSB-800 | AKS/TSB-1000 | AKS/TSB-1200 | AKS/TSB-1500 | AKS/TSB-2000 |
capacity | 200kVA | 300kVA | 400kVA | 630kVA | 800kVA | 1000kVA | 1200kVA | 1500kVA | 2000kVA |
enter | |||||||||
Rated voltage | 400V (AC) | ||||||||
frequency | 50Hz/60Hz | ||||||||
Phase | three phase | ||||||||
output | |||||||||
frequency | 50Hz/60Hz | ||||||||
Rated output voltage | 900~1100V (AC) | ||||||||
Phase | three phase | ||||||||
Technical realization | |||||||||
Engineering realization | The equipment outside the cave is matched with the voltage stabilizer cabinet, and the cave is specially developed and equipped with a set of long-distance transmission booster. The power supply radius is ≥5000 meters for transmission, which can meet the electricity demand of any equipment | ||||||||
Performance characteristics | There is no need to replace the cable, the original construction cable is used, the installation is convenient and fast, it can be reused, and it is safer than the high voltage hole! Cost saving, affordable and durable | ||||||||
parameter | |||||||||
conveying distance | ≥5000 meters | ||||||||
No-load current | <4% | ||||||||
Compressive strength | 3000V/min without breakdown; test instrument: YZ1802 withstand voltage tester (20mA) | ||||||||
Insulation class | Class F | ||||||||
Insulation resistance | ≥2MΩ Test instrument: ZC25B-4 megohmmeter (<1000V) | ||||||||
Connection method | YN | ||||||||
Coil allowable temperature rise | 180℃ | ||||||||
Cooling method | natural air cooling | ||||||||
noise figure | ≤50db(1m) | ||||||||
use | |||||||||
Altitude | ≤3000 meters | ||||||||
working environment | Avoid exposure to rain, humidity, heat, extreme heat or direct sunlight. There should be a distance of not less than 40cm between its cooling vents and surrounding objects; | ||||||||
Working humidity | Relative humidity<80% | ||||||||
Storage conditions | Avoid long-term upside-down storage and transportation, and can not be subjected to strong impact | ||||||||
Serve | |||||||||
Test program | Under normal power supply conditions, the CPU intelligent operation control is steplessly adjusted, and all parameters are set through the display screen operation or computer setting. When a fault occurs, the machine can issue an alarm, and press the button on the display surface to mute the sound. Liquid crystal LCD Chinese and English menus Display, dynamic scanning fault record, beautiful and clear display | ||||||||
After-sale service | After the machine is installed, the main parts of the machine will be maintained for one year (excluding harsh environments), and the cost of labor and materials will be maintained after one year. The machine has a service life of ten years under normal conditions; it is declared that the regular maintenance and inspection conditions are once every 5 to 10 working days. | ||||||||
Engineering case | |||||||||
One: Unit 95668 of the Chinese People's Liberation Army | Sixteen: Xinjiang Jinvanke Engineering Technology Co., Ltd. | ||||||||
Two: The 96635 Unit of the Chinese People's Liberation Army | Seventeen: China Aviation Industry Supply and Marketing Changsha Co., Ltd. | ||||||||
Three: The 75131 Unit of the Chinese People's Liberation Army | Eighteen: Zhejiang Provincial Tunnel Engineering Company Jinliwen Gas Pipeline Project Tunnel | ||||||||
Four: China Railway First Bureau Ningde Shenhai Expressway | Nineteen: Qingdao Highway Construction Group Co., Ltd. Qinghai Engineering Tunnel | ||||||||
Five: Engineering Project Department of China Railway Fourth Bureau | 20: China Railway Bridge Bureau Co., Ltd. Qiaoxiao Expressway | ||||||||
Six: China Railway 11th Bureau Engineering Project Department | Twenty-one: Shanxi Tongjin Mining Co., Ltd. | ||||||||
Seven: China Railway 12th Bureau Engineering Project Department | 22: Shandong Yantai Baiheng Gold Mine Co., Ltd. | ||||||||
Eight: Wujiazhai Tunnel of China Railway Seventeenth Bureau | Twenty-three: China Railway Third Bureau Group Second Engineering Co., Ltd. | ||||||||
Nine: China Railway 18th Bureau Shanlian No. 1 Tunnel | Twenty-four: China Water Resources and Hydropower Ninth Engineering Bureau Co., Ltd. | ||||||||
Ten: Engineering Project Department of China Railway 24th Bureau | Twenty-five: Air Force Engineering Construction Bureau of the Eastern Theater of the Chinese People's Liberation Army | ||||||||
Eleven: The Second Detachment of Traffic of the Chinese People's Armed Police Force | Twenty-six: China Railway Eighth Bureau undertakes the construction of the (Laos) Belt and Road project | ||||||||
Twelve: The Fourth Traffic Detachment of the Chinese People's Armed Police Force | Twenty-seven: CCCC Xiamen Engineering Co., Ltd. | ||||||||
Thirteen: CCCC Fourth Highway Engineering Bureau Co., Ltd. and Yu Expressway | 28: Zhejiang Tunnel Engineering Group Co., Ltd. | ||||||||
Fourteen: Fujian Strait High Speed Ro-Ro Passenger Shipping Co., Ltd. | Twenty-nine: Wanju International (Hangzhou) Supply Chain Co., Ltd. | ||||||||
Fifteen: Jinliwen Tunnel of China Water Resources and Hydropower Twelfth Engineering Bureau Co., Ltd. | Thirty: China Water Resources and Hydropower Eleventh Engineering Bureau Co., Ltd. Huinu Lingxi Water Diversion Project C3 Project Manager Department |